PROJECTS

Homestead Road Re-Build Gamebird to Manse

Project Description: Improvements on Homestead Road, between Gamebird Road and Manse Road and will include the removal of existing pavement, base and sub-base materials and replacement with structural fill, Type II aggregate, geogrid, and plant-mix bituminous pavement, reconstruction of driveway approaches at all noted existing paved/un-paved driveways within the project area, adjustment of any and all valves and manholes per elevations dictated by the construction plans, installation of intersection lighting and the installation of all pavement striping and markings and the removal, relocation, installation of signs impacted by the roadway improvement activities.

Exit 118

Project Description:  New Interchange mile post 118 for Interstate 15

VVWD 24” Transmission Pipeline

Project Description: Construction of approximately 2 ½ miles of 24” Ductile Iron Pipeline, 1 mile of 12” Ductile Iron Pipeline. Scope of work includes furnishing and installing pipeline and appurtenances, and asphalt repaving and a cathodic protection station.

2020 Mesquite Street Reconstruction Project – Phase 1.

Project Description: The project includes, Asphalt Milling, Grading, Pulverizing and Asphalt Replacement on the following streets: Oasis Boulevard (Pioneer BLVD to Palmer LN), Canyon Crest Boulevard (Mesquite Heights to OPD Substation), Jensen Drive, Old Mill Road (Town Wash to North Arrowhead LN), Pioneer Boulevard (Falcon Ridge PKWY to Calais DR), Pinnacle Court, Hafen Lane (Abbott Wash to Riverside RD),

Turtleback Road (Pioneer BLVD to Via Ventana), Hillside Drive (Canal Street to Parkview Drive)

located within Mesquite, Clark County, Nevada.

PULVERIZING AND PAVING (PG 70-10) ANVIL ROAD FOR 20,750 LINEAL FEET AND
POWERLINE ROAD FOR 7,602 LINEAL FEET, LOCATED IN AMARGOSA VALLEY, NYE
COUNTY, NEVADA.

Project Description: The East Anvil Road, located in Amargosa Valley, Nye County, Nevada. The project consists of pulverizing twenty-eight (28) feet wide, grading, compacting, and paving approximately 20,750 lineal feet of East Anvil Road from a point West of Nevada Highway 373, to South Powerline Road. Pavement will be constructed to a width of twenty-six (26) feet. Three intersections (North Pueblo Road, North Calico Street, North School Lane) will also be repaved at their existing paved width.

South Powerline Road, located in Amargosa Valley, Nye County, Nevada. The project consists of pulverizing twenty-eight (28) feet wide, grading, compacting, and paving from a point 100 feet North of East Anvil Road, to a Southern point on South Powerline Road for approximately 7,602 lineal feet to a width of twenty-six (26) feet.

Dual Media Filters Phases 3 & 4 (CMAR)

Project Description: The expansion of the Dual Media Filters and Disinfection Facilities at Clark County Water Reclamation District Flamingo Water Resource Center.  This expansion includes the addition of granular media filters (anticipated as 16 cells with a nominal capacity of 65 mgd), a new Filter Influent Pump Station (FIPS), retrofit of the existing medium pressure UV disinfection facilities, new UV disinfection facilities (anticipated as one new low pressure channels), two new pumps at the existing backwash supply facility, retrofit of the existing waste wash water facility, replacement of the existing chemical feed facility, one new blower at the existing blower facility, a new equalization basin, and modifications to the existing effluent Parshall flume.  The expansion will also include site work, utility relocations, and permitting.

+ PROJECT ONE

Homestead Road Re-Build Gamebird to Manse

Project Description: Improvements on Homestead Road, between Gamebird Road and Manse Road and will include the removal of existing pavement, base and sub-base materials and replacement with structural fill, Type II aggregate, geogrid, and plant-mix bituminous pavement, reconstruction of driveway approaches at all noted existing paved/un-paved driveways within the project area, adjustment of any and all valves and manholes per elevations dictated by the construction plans, installation of intersection lighting and the installation of all pavement striping and markings and the removal, relocation, installation of signs impacted by the roadway improvement activities.

+ PROJECT TWO

Exit 118

Project Description:  New Interchange mile post 118 for Interstate 15

+ PROJECT THREE

VVWD 24” Transmission Pipeline

Project Description: Construction of approximately 2 ½ miles of 24” Ductile Iron Pipeline, 1 mile of 12” Ductile Iron Pipeline. Scope of work includes furnishing and installing pipeline and appurtenances, and asphalt repaving and a cathodic protection station.

+ PROJECT FOUR

2020 Mesquite Street Reconstruction Project – Phase 1.

Project Description: The project includes, Asphalt Milling, Grading, Pulverizing and Asphalt Replacement on the following streets: Oasis Boulevard (Pioneer BLVD to Palmer LN), Canyon Crest Boulevard (Mesquite Heights to OPD Substation), Jensen Drive, Old Mill Road (Town Wash to North Arrowhead LN), Pioneer Boulevard (Falcon Ridge PKWY to Calais DR), Pinnacle Court, Hafen Lane (Abbott Wash to Riverside RD),

Turtleback Road (Pioneer BLVD to Via Ventana), Hillside Drive (Canal Street to Parkview Drive)

located within Mesquite, Clark County, Nevada.

+ PROJECT FIVE

PULVERIZING AND PAVING (PG 70-10) ANVIL ROAD FOR 20,750 LINEAL FEET AND
POWERLINE ROAD FOR 7,602 LINEAL FEET, LOCATED IN AMARGOSA VALLEY, NYE
COUNTY, NEVADA.

Project Description: The East Anvil Road, located in Amargosa Valley, Nye County, Nevada. The project consists of pulverizing twenty-eight (28) feet wide, grading, compacting, and paving approximately 20,750 lineal feet of East Anvil Road from a point West of Nevada Highway 373, to South Powerline Road. Pavement will be constructed to a width of twenty-six (26) feet. Three intersections (North Pueblo Road, North Calico Street, North School Lane) will also be repaved at their existing paved width.

South Powerline Road, located in Amargosa Valley, Nye County, Nevada. The project consists of pulverizing twenty-eight (28) feet wide, grading, compacting, and paving from a point 100 feet North of East Anvil Road, to a Southern point on South Powerline Road for approximately 7,602 lineal feet to a width of twenty-six (26) feet.

+ PROJECT SIX

Dual Media Filters Phases 3 & 4 (CMAR)

Project Description: The expansion of the Dual Media Filters and Disinfection Facilities at Clark County Water Reclamation District Flamingo Water Resource Center.  This expansion includes the addition of granular media filters (anticipated as 16 cells with a nominal capacity of 65 mgd), a new Filter Influent Pump Station (FIPS), retrofit of the existing medium pressure UV disinfection facilities, new UV disinfection facilities (anticipated as one new low pressure channels), two new pumps at the existing backwash supply facility, retrofit of the existing waste wash water facility, replacement of the existing chemical feed facility, one new blower at the existing blower facility, a new equalization basin, and modifications to the existing effluent Parshall flume.  The expansion will also include site work, utility relocations, and permitting.